05022024Thu
Last updateSun, 04 Feb 2024 4am

Technip, Odebrecht & ICA Fluor JV awarded EPC contract by Braskem Idesa for the Ethylene XXI

Braskem Idesa S.A.P.I. awarded to a joint venture formed by Odebrecht (40%), Technip (40%) and ICA Fluor (20%) a contract worth more than US$ 2.7 billion (around €2.1 billion) for the engineering, procurement and construction (EPC) of a petrochemical complex to be built in the Coatzacoalcos/Nanchital region, in the Mexican state of Veracruz.

The petrochemical complex will include the following facilities:

  • An ethane-based ethylene cracker, producing 1 million tons per year, using Technip proprietary technology.
  • Two high density polyethylene plants using INEOS Innovene™ technology
  • A low density polyethylene plant using BASEL Lupotech technology.
  • Storage, waste treatment and utility facilities, including a 150 MW combined cycle power and steam co-generation plant.
  • A multimodal logistics platform for shipment of 1 million tons per year of polyethylene via bulk train, bulk truck or bagged.
  • Administrative, maintenance, control room and ancillary buildings.

The JV project team will execute the contract in several operating centers mainly located in Nanchital and Mexico City (Mexico), Rome (Italy), Lyon (France) and Rotterdam (The Netherlands). The project is scheduled for completion, with the plant ready for start up, in June 2015.

Adidas Yeezy shoes